The reconstruction of a 110kV switchyard at the 110/35/10kV Kazlų Rūda TS
August 30, 2018
Installed an OPGW at the 110kV OL stretch of Neris-Molėtai-Utena
December 2, 2019Reconstruction of the 35/10 kV Smiltynė TS design
The project will carry out the reconstruction of the existing 35/10kV Smiltynė TS by installing new 35kV and 10kV switchgear and 35/10kV power transformers.


A brand new modular building for 35kV and 10kV switchgear, relay protection cabinets, AC/DC boards, RTU and AEEAS units.