The reconstruction of section 110kV VE2 – VE3 L2
December 2, 2019
The reconstruction of the 110kV switchyard at 110/6kV Vilkpėdė TS
The reconstruction of the 110kV switchyard at 110/6kV Vilkpėdė TS
3D modelling was used to prepare for the reconstruction of a 110kV switchyard at 110/6kV Vilkpėdė TS
The design of a single-line TT diagram, with the possibility to extend it to a THT type diagram.